• Value Based on Experience
  • Talk To Expert : +90 312 557 56 39

405 MW Silopi Thermal Power Plant Project

Project Details

Construction of a 3 x 135 MW asphaltite fired thermal power plant which is based on circulating fluidized bed (CFB) technology

  • Project Name 405 MW Silopi Thermal Power Plant Project
  • Client Ciner Grubu
  • Project Type EPC Contractor
  • Project Location Silopi – Turkey
  • Completion Date 2010